| Location: | Southeast Corner of US Highway 50 Alternate and Nevada Pacific Parkway Fernley, NV 89408 Lyon County |
| APN#: | • 021-201-49 (download plat map) |
| Owner: | Fallon Paiute Shoshone Tribe |
| Land Status: | Held in Trust for the Tribe |
| Zoning: | Commercial/Retail, Industrial, Residential, or Agricultural |
| Acreage: | • ~1 Acre Pad Site Available • Lease Only (ground lease or build-to-suit options) - Subdividable |
| Highway Frontage: | • ~150 ft. Available on US Highway 50 Alternate • US Highway 50 Alternate is a 4 Lane Highway |
| Other Street Frontage: | • ~219 ft. Available on Nevada Pacific Parkway • Connects to US Highway 50 Alternate |
| External Site Access: | • No Existing Entrances Directly from US Highway 50 Alternate (direct access via Nevada Pacific Parkway) • 1+ Entrances from Nevada Pacific Parkway |
| Internal Site Access: | Developed - Site Paved |
| Businesses Located on Site: |
Fox Peak Station Fernley (combination convenience store, gas station, and smoke shop owned by FTDC) |
| Surrounding Area: | • 1.75 Miles East of Fernley Roundabout on US Highway 50 Alternate • Borders US Highway 50 Alternate on the North • Miscellaneous Commercial/Retail Planned for Immediate Sites to the South, East, and West • Residential Further to the South, East, and West |
| Rail Service: | • No Service to Site • Union Pacific Railroad (Mainline) - Possible Access .5 Miles North |
| Water and Sewer Service: | • Provided by City of Fernley • Water Main Accessible (stubbed to pad) • Sewer Main Accessible (stubbed to pad) |
| Electric Power Service: | • Provided by NV Energy • Transmission Lines Accessible (along northern property border) |
| Natural Gas service: | • Provided by Southwest Gas Corporation • Natural Gas Lines Accessible (stubbed to pad) |
| Telecom Services: | • AT&T (primary) - Complete Packages Available |
| Fire Protection Services: | • North Lyon County Fire Protection District • Located 3 Miles West of Site |
| Police Protection Services: | • Lyon County Sheriff's Office • Fernley Substation 2.3 Miles West of Site |
| Phase 1 Environmental Assessment: | Completed on November 21, 2007 |